Model#700

7 Gallon Paint Tank

5 Gallon Air Tank

Assembly And Operations INFO

  1. Install front axle and wheel.
  2. Install rear axle and wheels.
    Secure with slip nuts.
  3. Place long end of outrigger into
    bracket beside from wheel.
    Shoe may be used on either side
    for left or right hand striping.
  4. The shoe goes on the short end
    of outrigger and is held in place
    with J pin.
  5. Adjust outrigger support arm by
    bending up or down, so the shoe
    slides on pavement at all time.
    For Turn Striping, adjust J hook so
    that shoe cuts through grass but does
    drag on the ground.
  6. Use 3/8 bolt on frame, to support paint tank.
    Secure with bungee cord.
  7. Mount regulator and pressure gauge
    on paint tank. DO NOT over-tighten
  8. Install handles and bolt securely.
    Hook chain from handle to control valve,
    on bottom of paint tank.
  9. Install paint supply hose from bottom
    of paint tank to nozzle assembly at shoe.
  10. Mount the air tank on frame between
    brackets, Secure with bungee cord.


Home | About Us | Privacy Policy | Warranty | Contact Us | Training | Site Map | Table of Contents

Price Traffic Products
3810 Harvey Rd., Suite 101,
College Station, TX 77845
sales@pricetrafficproducts.com

Contact Us
Toll Free: 1-800-392-1979     Fax: 1-800-235-8984
Local: 979-774-9191     Fax: 979-774-9193

Copyright 2006
Questions to webmaster
site by misite.net